Updated 15 November 2026 · 7-minute read
A reorder point is the stock level that tells you “order now”. Set it too low and you run out while waiting for the delivery; set it too high and cash sits on the shelf. Here's a plain method that needs only two numbers you already know, plus a worked example.
Three numbers: min, max and order quantity
- Min level (reorder point) — when stock falls to this number, order more.
- Max level — the most you want on hand. It caps how much you order.
- Order quantity — how much to order. With a min/max system it's simply max − what's on hand when you place the order.
That's the whole system. It's what most small businesses need: no forecasting software, just a sensible trigger and a sensible cap for each item that matters.
The simple method
You need two facts per item:
- Average daily usage — how many you sell or use on a normal day.
- Lead time — how many days from placing an order to having the stock on the shelf. Use the slow end of normal, not the best case.
Then:
Reorder point = daily usage × lead time + safety stock
Safety stock = daily usage × the extra days a delivery can be late
Max level = reorder point + the amount you normally order at once
Safety stock covers the bad week: a late delivery or a busier-than-usual few days. If you have no idea how late deliveries run, start with two or three days of usage and adjust.
Worked example: AA batteries at a hardware counter
The shop sells about 4 packs a day. The supplier usually delivers in 5 days, but sometimes it takes 7.
| Step | Calculation | Result |
|---|---|---|
| Usage during the lead time | 4 packs × 5 days | 20 |
| Safety stock | 4 packs × (7 − 5) late days | 8 |
| Reorder point (min) | 20 + 8 | 28 |
| Normal order | about two weeks of sales: 4 × 14 | 56 |
| Max level | 28 + 56 | 84 |
When stock drops to 28 packs, it's time to order 84 − 28 = 56. Over the next five days about 20 sell, so the delivery arrives when there are around 8 left — exactly the safety stock — and the shelf goes back up to about 64.
Where to get the numbers
Daily usage
Look at the last 30 to 90 days, not one busy weekend. In StockKit, open the item and read its history, or export the movements CSV and add up the issues for that item over a period, then divide by the number of days. If an item is seasonal, use the same season last year, or set the levels again when the season changes.
Lead time
Count from the day you place the order to the day the stock is usable — including the time it sits in a box before someone shelves it. Ask the people who receive deliveries; they know which supplier is always two days late.
Per-location reorder points
Sometimes the total isn't what matters. A plumber's van needs ten compression elbows in the van, even if the warehouse has a hundred. In StockKit you can add a min level for one location as well as the overall level. The reorder list then flags the van when it runs low, and the fix is usually a move from the warehouse, not a purchase.
Don't set levels for everything on day one
Start with the items that hurt when they run out — the fast sellers, the things a job can't start without, and anything with a long lead time. A useful rule of thumb is the 80/20 split: a fifth of your items usually make up most of your sales or usage. Give those proper levels, give the rest a rough minimum, and refine as you learn.
Common mistakes
- Using the best-case lead time. Plan for the normal slow delivery, not the fastest one you've ever had.
- Round numbers with no data. “Min 10” for every item means fast movers run out and slow movers pile up.
- Forgetting pack sizes. If the supplier sells in boxes of 12, round your order to whole boxes.
- Never revisiting. Check levels every quarter, or whenever an item runs out or keeps sitting at max.
- Untracked usage. Reorder points only work if stock leaving the shelf is recorded. Make scanning out as easy as possible — that's why StockKit's −1 button is huge.
How StockKit uses your levels
Give an item a min level (and optionally a max) on its page. When the on-hand quantity is at or below the min, the item appears on the reorder list and the Alerts tab shows a badge. The suggested order quantity is max − on hand; if you haven't set a max, StockKit suggests topping up to twice the min. Tick the lines you want, and StockKit creates draft purchase orders grouped by supplier, ready to download as PDF.